Case study 01 — Linear · Design Systems
Cutting handoff from days to a single PR review.
Linear’s 11-person design org rebuilt its product surface on DRFF in Q2–Q3 2024, collapsing three review cycles into one and shipping the redesigned app shell two weeks ahead of plan.
- −63%
- design-to-dev handoff time
- 2 wks
- shipped ahead of roadmap
- 11 → 1
- review cycles per component
Read the full Linear field report“We stopped translating Figma into a build spec by hand. Tokens, components and review notes now live in one place — and our engineers actually read the changelog.”